|
GENERAL INFORMATION
- UP to 100,000 lifetime cycles is expected from this mold.
- Mold shall produce acceptable parts at or below target estimated molding cycle as supplied by Tooling Engineer.
- Mold shall be built to produce 1.33 Cpk quality parts minimum.
- Approved shrink factors for the selected plastic molding material shall be supplied by Tooling Engineer and documented in writing.
- Engineering shall supply IGES/CAD files for part dimensions, part prints, and approved title block upon release of purchase order.
- Tooling Engineer shall supply molding machine platen layout and ejector KO pattern in writing.
- Preliminary mold design shall be approved by Tooling Engineer prior to start of mold construction.
- Basic mold design shall be supplied to after tool approval.
- All screws, bolts, leader pins/bushings, ejector pins, ejector blades, etc. shall be standard stock items wherever possible.
|